Office & Infrastructure
Grade-A offices, coworking, serviced space or a standalone campus — matched to your stage of entry rather than sold on rent alone. Before you sign, we verify who is actually responsible for handover condition, connectivity and power resilience.
- Handover responsibility verified before signing — in a new business park, the developer, landlord, property manager and facility provider can be four different parties.
- Coworking, serviced or private office matched to your actual team size and stage, not sold on rent alone.
- Dedicated fibre, UPS and generator backup, and access control assessed against your real operating needs.
- Trade-offs across Colombo's commercial zones weighed for connectivity, power resilience and access to talent.
Common questions
Coworking, serviced office or a private lease — which one? +
Choose on team size and entry stage, not unit cost. Early on, when headcount is small and still moving, coworking or serviced space gets you in within the week; once numbers settle and you need your own operating floor, a private lease is cheaper over time.
Read more: Choosing between the three office formatsWhat must be confirmed before signing an office lease? +
Beyond rent and area: the handover standard, when you can actually start work, who connects power and network, and whether you may operate during your real hours. Companies that are fully registered but still cannot start work are usually stuck on one of these.
Read more: Business terms to confirm before signingIn a new business park, who is actually responsible? +
This is the classic trap: developer, landlord, property manager and facility provider can be four different parties, with handover condition, connectivity and backup power each belonging to someone else. Name the responsible party per item before signing.
Read more: Verifying handover parties and infrastructure responsibilityHow resilient is power and connectivity? +
Assess it against your real operating needs rather than asking whether backup power exists. Confirm how long it lasts, which circuits it covers, whether switchover is automatic, and whether the line is dedicated with a second path. A 24/7 operation and a standard office need different answers.
Read more: Zones, connectivity, power and continuityWhich part of Colombo suits an operations team? +
There is no single best area — it is a trade-off between infrastructure quality, commuting access for staff, and rent. Tech and BPO teams usually protect the first two, because difficult commutes show up directly in hiring and attrition.
Read more: Choosing an office location in ColomboWhat stands between getting the space and starting work? +
Connectivity activation, power, furniture, access control and inspection — with dependencies between them and lead times you do not control. Sequence them into a readiness checklist before handover, running in parallel.
Read more: The office launch readiness checklistShould we wait for incorporation before choosing an office? +
Not for the search. Shortlisting, viewing and negotiating can all run first; signing usually needs the entity. Run it to signature-ready in parallel and sign the moment the entity exists, rather than starting the search afterwards.
Read more: Sequencing the lease against incorporationHow do we leave room to expand? +
Negotiate it into the lease: rights over adjacent space, break or sublet provisions, and a term that matches your expansion pace. These clauses cost almost nothing at signing and a great deal to obtain later.
Read more: Building expansion room into lease terms